Project · La Vergne, TN · 2024
City of La Vergne Public Works facility
A long-span main building plus three steel outbuildings for the city's public works campus. We supplied the pre-engineered steel buildings and erected them.
Four steel buildings on one public works campus
The main building is a clear-span gable frame about 404 feet long, finished by others in stone and glass, so from the street you'd never guess it's a pre-engineered metal building. Behind it sit three single-slope outbuildings for the city's trucks and equipment and a wash bay.
We supplied the engineered steel building packages from the manufacturer, with drawings sealed for Tennessee, and our crews erected the main building's red-iron frame plus the three complete outbuildings so the general contractor could keep the rest of the site moving.
What we did
- Pre-engineered steel building packages, permit and anchor bolt drawings sealed for Tennessee
- Erection of the main building's red-iron frame and all three outbuildings, frame to panels
- Single-slope (1:12) outbuildings, including open-sided equipment bays and an open wash bay
- Worked inside the GC's schedule on an active municipal site
The buildings
| Building | Size |
|---|---|
| Main building (gable, clear span) | about 404 ft long |
| Vehicle & equipment building 1 (single slope) | 29'-9" x 189'-9" |
| Vehicle & equipment building 2 (single slope, open high side) | 24'-9" x 189'-9" |
| Wash bay (single slope, open) | 21'-6" x 40' |
The three outbuildings total about 11,200 sq ft.
From red iron to ribbon cutting




The steel behind it
We model every job from the manufacturer's sealed drawings, so a GC can see frame lines, slopes and open sides before steel ships. Send us your plans and we'll show you yours.
Need a PEMB erector in Tennessee or anywhere in the Southeast?
We bid steel building supply and erection for general contractors and owners. Multiple crews totaling 60+ qualified, OSHA-certified men, ready to travel the Southeast.